• topair@topair.kr

    Send us an e-mail

  • 055-853-9922

    Get in touch with us

> HVAC SYSTEM > PROJECT REFERENCE LIST
PROJECT REFERENCE LIST
No. Project Title Main Contractor Client Completion
1 Otumara Node For Domgas Projects (Control BLDG)
HVAC equipment, Control Work, Installation work
Daewoo ENC Shell 2012
2 Otumara Node For Domgas Projects (Telecom BLDG)
HVAC equipment, Control Work, Installation work
Daewoo ENC Shell 2013
3 Otumara Node For Domgas Projects (Switch Gear BLDG 0.4, 3.3, 1kV)
HVAC equipment, Control Work, Installation work
Daewoo ENC Shell 2013
4 West Qurna Field 2nd Phase Project (MCB, SIH01,02)
HVAC equipment, Control Work, Installation work
Samsung engineering Lukoil 2014
5 West Qurna Field 2nd Phase Project (SIH05,06,07,08,10,75)
HVAC equipment, Control Work, Installation work
Samsung engineering Lukoil 2014
6 EPC Well pads and Oil Gathering System Project (WP02,12)
HVAC equipment, Control Work, Installation work
EMERSON China Lukoil 2014
7 Southern Swamp Gas Gathering Pipelines Project
HVAC equipment, Control Work, Installation work
Daewoo Nigeria Limited Shell 2015
8 RPLC Deep Conversion
HVAC equipment, Control Work, Installation work
Hyundai Heavy Industries PDVSA 2015
9 EPC For Rumaitha/Shanayel Facilities-phase III
HVAC equipment, Control Work, Installation work
GS E&C ADCO 2016
10 KNPC MAA CFP
HVAC equipment, Duct, Installation work
Schneider Electric Kuwait National
Petroleum Company
2016
11 LA MEG-1
HVAC equipment, Control Work, Installation work
Samsung engineering
Sea Louisiana Construction
Lotte Chemical
Louisiana Construction
2017
12 BLNGT REGAS & JETTY
HVAC equipment, Duct, Installation work
GS E&C Bahrain LNG 2017
13 KARBALA REFINERY
HVAC equipment, Control Work, Installation work
GS E&C, SK E&C, HUNDAI HDGSK JV 2018
14 GBU PHASE 3A ENWHE
HVAC equipment, Control Work, Installation work
Daewoo ENC Shell 2020